We prepare project reports and CMA data for term loans and working-capital facilities: projected statements built from your own numbers, the ratios lenders test, and the supporting schedules in the format banks ask for. This page explains what goes into a report, how it is assessed, and what you need to provide.

10 documents
6 steps
Partner review

What is Project Report & CMA Data for Bank Loans?

A project report is the document a lender assesses when deciding whether to finance a business, setting out the proposal, the cost, the means of financing and projected financial statements. CMA data is the standard format in which banks require past and projected figures for a working-capital or term loan assessment.

Who needs it

  • Businesses applying for a term loan to buy machinery, build premises or fund an expansion.
  • Businesses seeking working-capital limits, where CMA data is part of the application and of each renewal.
  • Applicants under schemes for micro, small and medium enterprises, which require a project report in a prescribed shape.
  • Startups and first-generation businesses that have no track record and must support the proposal with projections.
  • Existing borrowers at the point of renewal or enhancement of their limits.
  • Businesses whose earlier application was returned for want of a properly supported projection.

Benefits

  • Projections built from the business's own drivers, so the assumptions can be explained at the appraisal meeting.
  • The ratios lenders actually test computed and presented: debt service coverage, current ratio and leverage.
  • CMA data in the standard format, with the past years and the projections on a consistent basis.
  • Working-capital requirement assessed on the operating cycle rather than asked for as a round figure.
  • The schedules and notes that support each projected line, so a query does not stall the file.
  • A view on which facility and which scheme fit the requirement before the application is made.

Key facts

ItemPosition
What it isThe document a lender assesses: proposal, cost, financing and projected statements
CMA dataThe standard bank format: audited past years, current-year estimate and projections
Core ratiosDebt service coverage, current ratio, leverage, break-even
Working capitalAssessed from the operating cycle, not requested as a round figure
Typical timelineTwo to three weeks from the point the information is available
Statutory due dateNone; dates follow the lender's sanction and renewal calendar
After sanctionStock statements, audited accounts and renewal CMA data as the sanction requires

What goes into a project report?

A lender reads a report in a particular order, and the report is easier to appraise when it is assembled in that order.

  • The proposal: what is being financed, why, and what it costs, supported by quotations or estimates
  • Means of financing: promoter contribution, the borrowing sought, and any subsidy, with the contribution evidenced
  • The business and the promoter: constitution, activity, experience, and existing borrowings
  • Projected profit and loss, balance sheet and cash flow, for the term the lender requires
  • The assumptions, line by line, with the basis for revenue, material cost, overheads and working capital
  • Ratio analysis: debt service coverage year by year and on average, current ratio, leverage and break-even
  • A sensitivity case showing the position if revenue falls short of the base case
  • CMA statements in the standard format, and the schedules supporting each projected line

How is DSCR calculated?

The debt service coverage ratio is the number the appraisal turns on for a term loan, because it answers whether the business can pay the instalments from what it generates. The figures below are illustrative.

LineYear 1Year 2Year 3
Profit after tax₹22,00,000₹31,00,000₹38,00,000
Add: depreciation₹18,00,000₹16,00,000₹14,00,000
Add: interest on term loan₹12,00,000₹10,00,000₹7,50,000
Cash available for debt service₹52,00,000₹57,00,000₹59,50,000
Interest on term loan₹12,00,000₹10,00,000₹7,50,000
Principal repayment due₹25,00,000₹25,00,000₹25,00,000
Total debt service₹37,00,000₹35,00,000₹32,50,000
DSCR1.411.631.83

Two points matter as much as the average. The lowest year governs, because that is when the business is most exposed, and here it is the first year, which is typical since repayment begins before the project reaches full capacity. And the ratio should survive the sensitivity case: a projection with a DSCR of 1.4 that falls below 1 on a 10% shortfall in revenue tells the lender the margin is thin, which is better addressed in the report than discovered at the appraisal.

How is the working-capital requirement worked out?

From the operating cycle: how long cash is locked up before it comes back. The figures below are illustrative, for a business projecting turnover of ₹6 crore.

ElementHolding periodIllustrative amount
Raw material30 days of consumption₹30,00,000
Work in progress15 days of cost of production₹18,00,000
Finished goods20 days of cost of sales₹26,00,000
Receivables45 days of turnover₹75,00,000
Gross working capital₹1,49,00,000
Less: creditors30 days of purchases(₹35,00,000)
Net working capital required₹1,14,00,000
Less: margin to be brought by the borrower at 25%(₹28,50,000)
Indicative bank finance₹85,50,000

The holding periods are the part an appraising officer will challenge, because they come from the business's own history and from what is normal in the trade. A projection that shortens the receivable period without explaining what will change is the most common weakness. The margin percentage is set by the lender's policy for the facility.

Why do applications get returned?

Rarely because the business is not viable. Usually because the file cannot be appraised as submitted.

  • Projected turnover that does not reconcile with the GST returns and bank credits the lender can already see
  • A revenue assumption with no stated basis, or one that implies a market share the business has never held
  • Existing loan repayments left out of the projected cash flow, which inflates the coverage
  • A working-capital request as a round figure, with no operating cycle behind it
  • Promoter contribution shown but not evidenced
  • No schedules, so every projected line generates a query and the file stops moving
  • A DSCR that works only in the base case, with no sensitivity
  • Quotations missing for the capital items being financed

Schemes for micro, small and medium enterprises

Several central schemes exist to improve access to credit, and the right one depends on the size of the enterprise, whether it is new or existing, and what is being financed. The credit guarantee scheme for micro and small enterprises enables lending without collateral by guaranteeing part of the lender's exposure up to a prescribed ceiling. Other schemes provide subsidy-linked finance for new enterprises, and small-ticket lending is channelled through designated routes with their own slabs.

Ceilings, eligibility and subsidy terms under these schemes are revised periodically, and some operate through particular categories of lender only. The practical approach is to settle the facility and the amount first from the project's own numbers, then check which current scheme the proposal fits, rather than designing the proposal around a scheme limit remembered from an earlier year.

Official sources

Documents required

  1. 01Financial statements and tax returns for the last two or three years, where the business exists
  2. 02GST returns and bank statements for the recent period
  3. 03Details of the proposal: what is being bought or built, with quotations or estimates
  4. 04Means of financing: promoter contribution, proposed borrowing and any subsidy or grant
  5. 05Existing loan details with sanction letters, outstanding balances and repayment schedules
  6. 06Order book, contracts or a basis for the projected revenue
  7. 07Cost structure: material, labour, overheads and the basis of each
  8. 08Details of land, building and plant, with ownership or lease documents
  9. 09Promoter profile, net worth statements and the constitution documents of the business
  10. 10Collateral details, where the facility is to be secured

Due dates and penalties

ItemDue dateIf missed
CMA data for renewal of working-capital limitsBefore the limit's renewal date, as the sanction requiresLimits can be held up or reduced pending renewal
Stock statements during the facilityAt the frequency the sanction requires, commonly monthlyDrawing power is restricted under the sanction terms
Audited accounts to the lenderWithin the period the sanction specifies after the year endA breach of the sanction conditions
Scheme applicationsWithin the window the particular scheme prescribes, where one appliesThe application falls outside the scheme for that period

A project report has no statutory due date; the dates that matter are set by the lender's sanction and renewal calendar and by the scheme, if one applies. Scheme eligibility, limits and subsidy terms are revised from time to time, so the current guidelines should be checked before an application is prepared.

Mistakes to avoid

  • Projecting a growth rate with nothing behind it, which is the first thing an appraising officer tests.
  • Projections that do not reconcile with the GST returns and the bank statements the lender can already see.
  • Asking for a working-capital limit as a round figure rather than deriving it from the operating cycle.
  • Ignoring the repayment of existing loans in the projected cash flow, which overstates the coverage available.
  • A debt service coverage ratio that only works in the base case, with no margin if sales fall short.
  • Omitting the promoter's own contribution, or showing a contribution that cannot be evidenced.
  • Projecting profit without the working capital that the extra turnover will absorb.
  • Submitting a report with no schedules, so every line attracts a query and the file stalls.

Why PHMG

  • Partner-led: a chartered accountant reviews your work, not only a junior team.
  • Clear fee and scope in writing before we start.
  • Deadlines tracked for you, with reminders well before the due date.
  • Your documents and data are handled confidentially.
  • Online service across India, with a single point of contact.

Fees depend on your case. Request a quote for a clear scope and fee.

How we handle your project report & cma data for bank loans

Step 01

Requirement and fit

We establish the amount and the type of facility needed, and whether a scheme applies to the proposal.

1–2 days

Step 02

Information gathering

We collect past financials, the proposal costing and the basis for the projected revenue and costs.

3–5 days

Step 03

Projections

We build the projected profit and loss, balance sheet and cash flow from the business's own drivers.

4–7 days

Step 04

Ratios and sensitivity

We compute debt service coverage, break-even and the other ratios, and test the projection against a lower case.

1–2 days

Step 05

CMA data and report

We prepare the CMA statements and the report, with the schedules and notes behind each line.

2–4 days

Step 06

Appraisal support

We respond to the branch's and the appraisal team's queries while the file is under consideration.

Until sanction

Frequently asked questions

Quick answers to the questions we hear most often.

Still have a question?

A chartered accountant will look at your case and reply within one business day.

Ask a CA
What do banks look for in a project report?

Four things, in this order: whether the proposal makes commercial sense, whether the projections are supported by something other than optimism, whether the cash flow services the proposed repayment with a margin, and whether the promoter has enough at stake. The financial statements matter, but the assumptions behind them matter more, because an appraising officer will test the revenue assumption against the order book, the GST returns and the industry before looking at the ratios.

What is CMA data?

CMA stands for credit monitoring arrangement. It is the standard set of statements in which banks require a borrower's figures: past years on an audited basis, the current year on an estimated basis, and future years projected, together with analysis of the operating cycle, the working-capital assessment and key ratios. Because the format is standard, lenders can compare one proposal with another, and because it includes past years, the projections sit directly beside the actual record.

What is DSCR and what level do lenders want?

The debt service coverage ratio measures how comfortably the cash a business generates covers the instalments and interest it has to pay. It is computed as profit after tax plus depreciation plus interest on the term loan, divided by the interest and principal repayments falling due in the year. Lenders look for a ratio comfortably above 1, since a ratio of exactly 1 leaves nothing for a shortfall, and they look at the average over the loan term as well as the lowest year. The level expected varies by lender, by sector and by the security offered.

How is a working-capital limit assessed?

From the operating cycle rather than from a round figure. The assessment works out how long money is tied up in inventory and in receivables, less the credit the business receives from suppliers, and applies that to projected turnover to arrive at the working capital the business will need. The lender then funds part of it and expects the borrower to fund the rest as margin. This is why a projection that increases turnover without increasing working capital is treated as incomplete.

How long does it take to prepare a project report?

Usually two to three weeks from the point the information is available, of which the projections and the ratio work are a smaller part than people expect. The time is mostly spent establishing the basis for the revenue and cost assumptions and reconciling the past figures with the GST returns and bank statements. Where accounts are not finalised or the costing of the proposal is still moving, the timeline follows those rather than the report.

Which schemes should a small business consider?

Several central schemes support credit to micro, small and medium enterprises. The credit guarantee scheme for micro and small enterprises allows lending without collateral by guaranteeing part of the exposure, up to the limits it prescribes. Other schemes provide subsidy-linked finance for new enterprises, or small-ticket lending through designated channels. Eligibility, the ceiling and the subsidy terms differ by scheme and are revised, so the right course is to check the current guidelines for the scheme against the proposal rather than to rely on a remembered limit.

Can a project report be prepared for a new business with no track record?

Yes, and that is a common case. Without past figures, everything rests on how the assumptions are built: quotations for the capital cost, a costing worked up from inputs rather than assumed, a revenue assumption grounded in something verifiable such as an order, a tie-up or comparable published data, and a promoter contribution that can be evidenced. Lenders expect a new project's projections to be conservative, and a sensitivity showing what happens if sales are lower generally helps the file rather than harming it.

Is a project report the same as a feasibility study or a business plan?

They overlap but serve different readers. A business plan is written for the promoter and for investors, and leads with the market and the strategy. A feasibility study tests whether a project is technically and commercially viable before anyone commits. A project report is written for a lender: its purpose is to show that the proposal is viable and that the cash flow will service the borrowing, in the format and with the ratios the lender assesses. The same underlying work can support all three, but the emphasis differs.

Last reviewed: October 2026

This content is for general information and does not constitute professional advice. Laws, rates and due dates change; please confirm the current position for your case before acting.

Speak to a chartered accountant

Ready to get started?

Tell us what you need. A qualified CA will review it and reply with next steps and a clear fee.

Reply within one business day · Your data stays confidential

CallWhatsAppEnquire